Maven RS.6 1-10x28
Who tested: Rokslide field eval (2024-12) — read the original write-up, which is the source of record. Who structured it: Optics Intel. We extract outcomes and cite; the testing labor is theirs.
Sample size: 1 (single serial number) — evidence about this unit, not a verdict on every unit shipped.
Stage-by-stage record
| Tracking / RTZ | Fail | turret rev-indicator skipped and locked twice during RTZ; adjustment value off 7% at 7.2 mils |
|---|---|---|
| 18″ drops | Shift | 0.1 mil up / 0.1 mil right on the first 18″ right drop; did not move again |
| 36″ (single) | Pass | — |
| 3×36″ | Pass | — |
| Long-term | Not tested | — |
Mount setup
Rings/mount: degreased. Ring torque: 20 in-lb. Torque caveat: the source flags mount-torque questions for this eval — weigh the results accordingly.
Notes
Drop shift minor and possibly ring-cap-torque related per source (drop eval may be redone); a bent internal zero-stop ring was photographed as the likely cause of the turret lockups.
What this eval didn't test
Long-term — this stage is shown as not tested, never assumed. If a later source covers it, this row is updated and the change is logged.
Spot an error — or is this your eval and you want to annotate or dispute the row? Contact us. Corrections are logged publicly on the provenance page.